Yond.01
In operation since 2020
The first building on the campus, in operation since 2020. A tried-and-trusted location for productive work and urban use with an attractive mix of tenants.
In operation since 2020
The first building on the campus, in operation since 2020. A tried-and-trusted location for productive work and urban use with an attractive mix of tenants.